Licensed Nevada contractor NSCB 0032580A · C-2 Electrical · A Simmons has been licensed here since 1991 · Bonded and insuredVerify our licenseCareersContact

Buying solar

How to check a solar contractor's licence in Nevada

A sixty second check on the State Contractors Board search: the status, the classification that allows solar, and the monetary limit that has to cover your job.

Checked on 2026-09-287 min read8 sources
A kitchen table in a Las Vegas home in late morning window light, with a phone lying face down beside a closed folder and a pair of reading glasses, desert landscaping and tile roofs outside

Ask for the licence number, then look it up yourself on the Nevada State Contractors Board's public licence search. On the details page read four things: the status says Active, the classification covers electrical work, the monetary limit is at least your contract price, and the business name matches your contract exactly. That takes about a minute and it is free.

Everything below is why those four fields matter, and what to do when one of them is wrong.

Why the check is worth a minute

The State Contractors Board's residential solar page gives a homeowner approached by a solar salesperson three tips in this order: ask for the contractor's name and licence number before engaging in discussions, verify the licence has an Active status on the Board's website or mobile app, and do not be pressured into signing on the spot.

The law behind it is blunt. NRS 624.700 makes it unlawful to act as a contractor or submit a bid in Nevada without an active licence, and says a bid or contract made in violation is void from the start. The Board's Residential Recovery Fund, the safety net for homeowners, is not available at all to a homeowner who hired an unlicensed contractor. The one check you can do before signing is the one that keeps that net under you.

Step 1: get the number and the exact name

You should not have to hunt. NRS 624.720 says all advertising by a licensed contractor must include the company name and the licence number, and the Board's advertising page lists where: vehicles, business cards, letterhead, signage, directories, print ads and websites. NRS 624.875 then requires every residential photovoltaic contract to state the contractor's name, address, licence number and the monetary limit on that licence.

So a door hanger, a truck or a quote with no licence number on it has already told you something. Write down the legal business name exactly as the contract prints it. You will need it at step 4.

Step 2: search the Board's database

The Board's licence search lets you search by licence number, company name, or principal or qualified individual. It needs at least two characters, and it accepts part of a name, so if you are unsure whether it is "Smith Construction" or "Smith Builders", searching "Smith" finds both.

The results list is deliberately thin. The Board says it is designed only to help you identify the record and that you need to open the License Details page to verify the data. Click through.

Step 3: read the four fields that matter

FieldWhat you want to seeWhy
StatusActiveAnything else means the company cannot lawfully contract with you today.
ClassificationC-2 electrical, or a C-2 subclassification covering photovoltaicsRooftop solar that makes electricity is electrical work.
Monetary limitAt or above your contract priceIt is the largest single job the Board lets that licence take on.
Business nameThe same legal name as your contractA licence held by someone else does not cover the company you are signing with.

The details page also shows an origin date, an expiration date, the qualified individuals and the bond. The origin date tells you how long the licence has existed, which is not the same thing as how long the company has been installing solar.

The classification: C-2, and why C-37 is not what it sounds like

NAC 624.200 sets out classification C-2, electrical contracting. A full C-2 licence may install any electrical wires, fixtures, appliances, apparatus, raceways and conduits, and may do the work of every C-2 subclassification. One of those, C-2g Photovoltaics, covers the installation, alteration and repair of photovoltaic cells, batteries and inverters, but not electrical wiring beyond the service panel.

That last clause matters when a job needs a new main panel or a service upgrade, which a lot of Las Vegas solar and battery jobs do. A C-2g alone stops at the panel.

The trap is classification C-37, "solar contracting". NAC 624.540 defines it as designing and installing systems that collect solar energy to heat and cool water, air and chemicals: solar water heating, space heating, solar air conditioning collectors and pool heating. It is not a licence for panels that make electricity. The Board's Recovery Fund page says a claim may be denied if the contract was outside the scope of the contractor's licence classification, so the wrong letter on the page is not a technicality.

The monetary limit: compare it to your price

NRS 624.220 requires the Board to put a monetary limit on every licence, and defines it as the maximum contract the contractor may undertake on one or more construction contracts on a single site for a single client. Contracting above it is cause for discipline under NRS 624.3015.

It also reaches your protection. The Board's Recovery Fund page says claims may be denied if the contract exceeded the contractor's monetary licence limit in force when you signed. A contractor may ask the Board to raise a limit, permanently or for one project, but that approval has to exist before the bid. If your quote is larger than the number on the details page, ask to see it.

If you are financing, the finance company has the same duty. NRS 598.982143 requires a solar lender, lessor or power purchase provider to ensure the installer is properly licensed and acting within the monetary limit of its licence. If it did not, the loan, lease or power purchase agreement is voidable by you for 3 years after the system receives permission to operate.

Step 4: match the name on the licence to the name on the contract

This is where most door to door problems show up. The Board's residential solar page lists as a common red flag a salesperson who says they "hire" or "work with" a local licensed contractor to do the installation, and says this usually indicates you are dealing with an unlicensed contractor, which puts you at increased risk of financial harm and liability. The same page says licences from other states are not valid in Nevada.

NRS 624.880 backs it up: a person advertising or soliciting residential solar work may not say or imply they will do the work or act as the contractor unless they hold a licence that authorises it. So search the company named at the top of the contract, not the installer the salesperson mentions.

Step 5: look for discipline, then decide

The Board publishes a public disciplinary actions search next to the licence search. Run the same name through it. A past action is not an automatic no, but read what it was for before you sign rather than after.

If something is wrong after the work starts, the Board investigates complaints against licensed contractors. Its complaints page describes the process: an acknowledgement letter to you, an investigator who decides whether a jobsite visit is needed and holds it with both of you present, and where corrective work is required a Notice to Correct sent to the contractor, usually within five working days of the visit, with a copy to you. The contractor generally gets 20 to 30 days to comply. The southern Nevada investigations line on the Board's contact list is (702) 486-1160, and the general line is (702) 486-1100.

The Recovery Fund, and who it covers

The Residential Recovery Fund is paid for by licensed residential contractors through a semi-annual assessment and administered by the Board. According to the Board's page:

  • It is available to owners of single family residences who occupy the home and contracted with a licensed residential contractor.
  • You must file a complaint with the Board within 4 years after completion of the work, or apply within 2 years of a Nevada court judgment.
  • The maximum paid for a claim is $40,000.
  • It is not available if you hired an unlicensed contractor, and a claim may be denied if the contract was outside the licence classification or over the monetary limit.

That is the whole case for the sixty second check: the fund only protects you from the contractor you verified.

Check us the same way

Simmons Solar Electric is Simmons Electric LLC. On the Board's licence search on the date at the top of this page, licence 0032580A read Active, classification C-2 Electrical, monetary limit $125,000, with an origin date in April 2013 and a surety bond on file. Do not take that from us; it takes a minute to look it up.

Once the licence checks out, the next job is the contract itself. What Nevada requires in a solar contract covers the cancellation clocks, the deposit cap and the warranty floors, and the questions to ask before you sign turns them into a list. If somebody is at your door offering to take over a warranty on a system someone else installed, the warranty takeover pitch is worth reading first, and if your original installer has already closed, start with what to do when your installer goes out of business.

We are a licensed Nevada electrical contractor, not a law firm, and this page is not legal advice. Every rule on it links to the source below.

Questions people ask us

How do I check a contractor's licence in Nevada?

Open the Nevada State Contractors Board licence search, choose licence number, company name or principal name, and search. Open the details page for the match. Confirm the status reads Active, the classification allows the work, the monetary limit covers your contract price, and the business name matches the one printed on your contract.

Which licence does a company need to install rooftop solar in Nevada?

Solar electric work is electrical work. Under NAC 624.200 a C-2 electrical licence covers installing any electrical wires and apparatus, and its subclassification C-2g covers photovoltaic cells, batteries and inverters, but not wiring beyond the service panel. A C-37 solar licence under NAC 624.540 is for solar heating of water, air and pools, not panels that make electricity.

What is a monetary limit on a Nevada contractor licence?

NRS 624.220 requires the Board to set one. It is the maximum contract a licensee may undertake on a single construction site for a single client. Bidding or contracting above it is cause for discipline under NRS 624.3015. The Board also says a Recovery Fund claim may be denied if the contract exceeded the limit, so compare it to your price.

The salesperson says they work with a local licensed installer. Is that normal?

The State Contractors Board lists it as a red flag. Its residential solar page says a salesperson who says they hire or work with a local licensed contractor usually indicates you are dealing with an unlicensed contractor. The company whose name is on your contract should hold the licence itself. Search that exact name.

Where do I complain about a solar contractor in Nevada?

The State Contractors Board investigates complaints against licensed contractors and takes separate complaints about unlicensed ones. An investigator reviews the allegations, may visit the job with you and the contractor present, and can issue a Notice to Correct. The southern Nevada investigations line on the Board's contact list is (702) 486-1160.

What is the Residential Recovery Fund?

A fund paid for by licensed residential contractors and run by the State Contractors Board. It can pay an owner occupant of a single family home up to $40,000 for actual damages caused by a licensed contractor. You must file a complaint within 4 years after completion of the work. It is not available if you hired an unlicensed contractor.

Where these numbers come from

  1. Nevada State Contractors Board, public licence search, searchable by licence number, company name or principal, with a details page showing status, classification, monetary limit, origin and expiration dates and bond; licence 0032580A read on the checked date checked 2026-09-28
  2. Nevada State Contractors Board, Residential Solar consumer page: quick tips if approached by a solar salesperson, common red flags, and the contract requirements checked 2026-09-28
  3. Nevada State Contractors Board, Residential Recovery Fund page: eligibility, exclusions, the 4 year complaint window, the $40,000 maximum and denial where a contract exceeded the licence limit or classification checked 2026-09-28
  4. Nevada State Contractors Board, complaints against licensed contractors: acknowledgement, jobsite visit and Notice to Correct checked 2026-09-28
  5. Nevada State Contractors Board, advertising requirements: the licence number on vehicles, business cards, signage, directories, publications and websites, citing NRS 624.720 checked 2026-09-28
  6. NAC 624.200, classification C-2 electrical contracting and subclassification C-2g photovoltaics, and NAC 624.540, classification C-37 solar contracting (solar heating), Nevada Administrative Code chapter 624 checked 2026-09-28
  7. NRS 624.220 (monetary limit), NRS 624.3015 (acting beyond scope or limit), NRS 624.700 (contracting without a licence, contract void), NRS 624.720 (advertising must carry the licence number), NRS 624.875 (licence number and monetary limit in every residential photovoltaic contract) and NRS 624.880 (solar advertising and solicitation), Nevada Revised Statutes chapter 624 checked 2026-09-28
  8. NRS 598.982143, the financier's duty to ensure the installer is properly licensed and inside its monetary limit, and the agreement voidable for 3 years after permission to operate, Nevada Revised Statutes chapter 598 checked 2026-09-28

We recheck this page quarterly. Last checked 2026-09-28. If a number here has moved, tell us and we will fix it the same week.

Free assessment

Find out what your roof can do.

We look at your roof, your panel and a year of your NV Energy bills, then hand you a fixed written price. If your roof is not a good candidate we will tell you that instead.

(725) 248-0578

Licensed Nevada contractor NSCB 0032580A. No obligation, and no visit until you ask for one.

Get your free quote

No cost, no obligation, no high-pressure pitch. If your roof is not a good candidate we will say so.

We usually reply the same business day. Prefer to talk? Call (725) 248-0578. Any contract you sign with us carries Nevada's cover page and cancellation right: three business days, ten if you are 60 or older. Actual utility rates may go up or down and actual savings may vary.

Thanks. We got it and will call you shortly, usually within the hour during business hours.